Narrative Description of the Project: In 2014; Jordan Islamic Bank contracted with the SSTecnocrats to design, supply, installation and operation of PV plant with a capacity of 275 kWp in Girls School / Bustan district. This system is designed as a unique case, having been installed in multiple zones in school buildings, each zone has its special design, construction and installation, where steel structures at different heights has been installed to carry the PV modules in some zones, while aluminum structure was used in other zones, with an annual productivity up to 1,750 kWh / kWp, and the breakeven period of 30 months. The system has been operated in March-2013, covered 68% of the school needs of electrical energy. |