Project Name:
Design, Supply, Installation and Commissioning of 100 kWp Roof-Top Solar Photo-Voltaic System.
Country and Location within the country:
Jordan; Amman
Client:
Shmaisani Hospital
Program Time Frame
System Construction
June 2014
System Operation
September 2014
Narrative Description of the Project:
In 2014, SSTecnocrats team has completed the installation of 100 kWp PV system for Al-Shmaisani Hospital that cover 26% of the hospital annual electrical energy needs. Steel structure were used to host the system. This system produces about 170 MWh/year of electricity, equivalent to about 45,000 JOD/year as monetary savings.
Copyright © 2017 SSTecnohub. Powered by: Amit Mangukiya