Project Name:
Design, Supply, Installation and Commissioning of 61 kWp Roof-Top Solar Photo-Voltaic System.
Country and Location within the country:
Jordan; Ma’an
Client:
Vocational Training Corporation
Program Time Frame
System Construction
Jan 2016 – Feb. 2016
System Operation
March. 2016
Narrative Description of the Project:
SSTecnocrats was contracted to design, supply and install 60 kWp of PV system for the Vocational Training Center in Ma’an, the mounting system is local galvanized steel designed to accommodate the 198 PV cell installed above roof where SSTecnocrats team designed and implemented the system and delivered onsite training for the students there on the installation of PV system, the system is expected to generate 116,000 kWh/year.